LOCATION
Aragon, Spain
SYSTEM TYPE
Hybrid
WIND CAPACITY
E-5 per site
SOLAR CAPACITY
6 to 8.3 kWp per site
INSTALLED
2023
APPLICATION
Off-grid telecom tower power
Project Overview
Ryse Energy has helped the Aragonese Government, Spain, work towards its energy targets while supplying residents and businesses with reliable network services. Our hybrid renewable systems have been installed across the Aragon region, particularly in the provinces of Huesca and Zaragoza.
In these rural areas, telecom signals are often weak or inconsistent where towers depend on a weak grid or on diesel generation. Our systems supply the towers with consistent clean energy.
Ejulve: 6 kWp of solar PV and an E-5 wind turbine supply a high-consumption telecom facility with an average of more than 50 kWh per day. The site leases space to network operators including Vodafone, Orange and Movistar. The system was pre-assembled at the factory and shipped as a single unit for quick installation.
Sos del Rey Católico: an E-5 wind turbine, 32 solar panels of 230 Wp, 2,000 Ah of battery storage and a 5,000 W inverter deliver more than 65 kWh per day from 100% renewable sources.
Huesca: an E-5 wind turbine, 36 solar panels of 230 Wp, 3,000 Ah of battery storage and a 6,000 W inverter deliver more than 70 kWh per day.
At night, when solar power is unavailable, the wind turbine charges the batteries. They discharge less deeply as a result, which extends the system’s useful life.
Products in this project: E-5 5 kW wind turbine and telecom tower hybrid power.
Frequently asked questions
How much energy does each off-grid telecom site produce?
Each site delivers 50 to 70 kWh a day from wind and solar: more than 50 kWh a day at Ejulve, more than 65 kWh at Sos del Rey Católico and more than 70 kWh in Huesca.
Why add a wind turbine to a solar telecom site?
Solar produces nothing at night. The E-5 wind turbine charges the batteries after dark, so they discharge less deeply and last longer.
How quickly can a site be installed?
At Ejulve the system was pre-assembled at the factory and shipped as a single unit, so installation and start-up on site were quick.
Can wind and solar replace diesel at an off-grid telecom tower?
Yes. The Aragon sites run on wind, solar and batteries with no grid connection, supplying 50 to 70 kWh a day.
How can Ryse help with a similar telecom site?
Ryse designs, supplies and installs hybrid wind, solar, battery and genset systems for off-grid and bad-grid towers, and provides maintenance and monitoring. See telecom tower hybrid power or talk to our team.
Project snapshots
See how it came together in real life.






What our partners say
Trusted by Industry Leaders Around the World
We’ve worked with telecom giants, governments and infrastructure providers to deliver long-term energy solutions where they matter most.

